* Maps,
* Pictures,
* Daily status reports
* Detailed descriptions of:
o where,
o when
o and what will be done this year.
* Basic information that will hopefully help answer most of the "why's."
|
2010 Sappington Barracks Rd. Improvement Stormwater improvements, sidewalk addition & new concrete pavement |
|
Concrete Slab Replacement Package Gates Manor; Oakwood Manor; Hilltop Dr. & Ct.; Sandian; Tioga Daybreak Ln. & Dr. and Windswept |
|
2010 Stormwater Projects Mattese Project #8 and Campus Drainage Improvement |
|
2010 Chip Seal The City of Sunset Hills is planning to perform a Chip Seal on Lombardy & Benbury. |
|
2010 Asphalt Rehabilitation (Denny Rd.) The City of Sunset Hills has a bid package out for the rehabilitation of Denny Rd. |
|
In-House Street Projects Work by our Street Department |
|
2010 In-House Concrete Slab Replacements The City Street Department are planning to perform slab replacements on several City Streets this year. |
|
Old Gravois Meramec River Bridge Fenton Public Works is providing construction management of a design from St. Louis County for the construction of a new Gravois Road Bridge over the Meramec River. State and Federal funds are involved with this project and updates at the St. Louis County website can be found at the link above |
|
Micro Seal Project We are planning Micro Seal for streets later this summer. The link above is to the project we performed in 2009. |
|
Reclamite We anticipate performing Reclamite on Old Gravois Rd. this year. The link above is to the project we performed in 2009. |
When utilities dig within City Right of Way, they make temporary repairs then contract out the final repairs of the street pavement within a couple of months to insure for proper compaction of the backfill of the project.
If you have general questions about project selection or street design that you would like to send to City Engineer, Anne Lamitola, you can e-mail her at alamitola@sunset-hills.com
Last updated: 8/3/2010 11:51:11 AM